4.5-kilometre bridge to link Crimea with Russia
From Wikinews, the free news source you can write!
Sunday, June 17, 2007
Last week a presentation of the bridge linking the Crimea with the Krasnodar region of Russia took place in Ukraine. The project cost of the deal is estimated at US$480 million. According to specialists, the bridge can be built within two years given adequate preparation.
The bridge project includes building a highway with the width of 15 metres; there will also be a possibility of the bridge supporting a future oil pipeline. The total length of the bridge will be about 4.5 kilometres.
The bridge over the Strait of Kerch could become a transit way to more than 10 million people a year and should decrease the travel distance from Ukraine to the Krasnodar Region by 450 kilometres.
Sources
- "Строительство моста Крым-Россия обойдется в 480 млн долларов (Russian)". yuga.ru, June 9, 2007
- "Строительство моста Крым-Россия обойдется в $480 млн (Russian)". RDZ-partner, June 9, 2007
| This page is archived, and is no longer publicly editable.
Got a correction? Add the template {{editprotected}} to the talk page along with your corrections, and it will be brought to the attention of the administrators. Please note that due to our archival policy, we will not alter or update the content of articles that are archived, but will only accept requests to make grammatical and formatting corrections. Note that some listed sources or external links may no longer be available online due to age. |
